Well week 3 is here and we had a moment where we look at the work we have done so far and wonder what on earth have we done.
Never have we ever gone to this level of restoration we have always just been repairing vehicles to restore the engineering parts to the normal however this time with us going in fully it is something very much new to us and we have really bitten off more then we can chew maybe but we are going for it anyway.
This week Jordan and Natalie bought a wreaking bar to help speed the process up as we was just taking the flooring up and then the wood however after trouble last week we decided to go straight in for the wood which as it turns out wasn’t a bad idea, This made life so much easier as we wasn’t doing the same job twice.
What also made it easy was The Storage Works has a locker we are using to store our stuff in meaning we can empty out and sort out the stuff we have on the bus as well as keep the seats etc in the unit safe and sound the less we have on there the better.
We have found some rot in the pealing of the floor however these are all easy to deal with and nothing too major for Shaun or Jordan to weld up.
Next week we hope to get more stuff into the unit but is a little hard with just a car when we are moving bus seats around. Then with a few more bits to move to the unit and few more parts which are proving hard to remove the from the bus it will allow us to remove the rest of the flooring and hopefully with the method we have found it should be rather easy.