The B10 has had new interior lights at Mancbuses we had changed the lights from the traditional tubes to the LED tape. As the tape heated up with the bus it has become unstuck from the bus, so using an adhesive that is for flooring to stick them back upRead More →

Job number two on the list was still to do with the air system and as you will of heard in the first video on the air dryer there was a massive leak towards the rear of the bus which was the valve on the gearbox as the Leyland AtlanteanRead More →

The first job on the list was to sort the Air issue out. This issue we had was the air system wouldn’t purge so it would build the air pressure up to a total of 160psi well we say that 160psi was the max the gauge could read and weRead More →