Callum Makes a Hash of it – Leyland Tiger Part 2

The Tiger is taking shape. We have got a lot of the work done off-camera in part 3 we will explain where we are up to and how we are working.

 

In this part we have removed the floor with as much grace as a drunk lamb, However here we are preparing the metal for any welding that is needed and looking at if any needs replacing.

In the middle of the video, I begin some welding on the coach but not on camera. As the coach is standing currently my own B10 has taken priority as the coach moves and my B10 is stuck in the current place. However, the coach has the outline completed but there is a small teething issue thanks to the size of the metal that Shaun ordered but I will explain this further in Part 3.